EFFECTIVENESS OF PROCUREMENT OF CONSTRUCTION MATERIALS AMONG ROAD WORKERS IN EKITI STATE

Authors

  • OLAOYE AJIBOYE OJO Department of Vocational and Technical Education, Faculty of Education, Ekiti State University, Ado Ekiti.
  • OLATILU Department of Vocational and Technical Education, Faculty of Education, Ekiti State University, Ado Ekiti.
  • AYOKUNLE ANA Department of Vocational and Technical Education, Faculty of Education, Ekiti State University, Ado Ekiti.

DOI:

https://doi.org/10.22159/ijss.2024.v12i2.49843

Keywords:

Procurement, Construction materials, Road workers, cost

Abstract

This study investigated the effectiveness of procurement of construction materials among road workers in Ekiti State. The descriptive research design was used for this study. Sixty copies of structured instrument were developed to collect information from the road construction workers. The data were analyzed using Statistical Package for the Social Science. The research questions were answered using percentage and mean while the hypothesis was analyzed using analysis of variance and tested at 0.05 level of significance. The finding of the study revealed that there is upward increase in the cost of procuring construction materials by workers in Ekiti, several factors such as sequence of materials delivery, availability of material in the local market, material changes in type, and specification during construction among others affect the procurement of construction materials by road workers in Ekiti State. It was revealed that majority of the road construction workers are experienced. It was also revealed that the experience of road construction workers does not influence the factors affecting the procurement of construction materials by workers in Ekiti State. It was recommended among others that concerted efforts should be made by construction industries on ways of procuring construction materials at a cheaper rate to avoid increase in the cost of construction in the State. It was also recommended that there is need to appoint and register procurement experts to manage various procurement of construction materials so that the cost of procurement of materials will be reduced and better attitudes toward the procurement of construction materials should be encouraged among the construction workers.

References

Cabibihan, J. J., Abu Basha, M. K., & Sadasivuni, K. (2016). Recovery behavior of artificial skin materials after object contact. In Social robotics: 8th international conference, ICSR 2016, Kansas City, MO, USA, November 1-3, 2016 proceedings 8(449-457). Berlin: Springer International Publishing.

Chartered Institute of Building. (2010). Procurement in the construction industry 2010: A report exploring procurement in the construction industry (pp. 1-29). Bracknell: Chartered Institute of Building.

Cheung, S. O., Suen, H. C. H., & Cheung, K. K. W. (2004). PPMS: A web-based construction project performance monitoring system. Automation in Construction, 13(3), 361-376.

Idoro, G. I. (2012). Influence of project plans on the outcome of construction projects procured by design-build (DB) in Nigeria. Journal of Construction in Developing Countries, 17(2), 77-99.

Inderst, G., & Stewart, F. (2014). Institutional investment in infrastructure in emerging markets and developing economies. Washington DC: Public Private Infrastructure Advisory Facility. Retrieved from https://www. ppiaf.org/sites/ppiaf.org/files/publication/ppiaf-institutional-investors-final/web.pdf.accessed [Last accessed on 23 November 2023].

Inuwa, I. I., Wanyona, G., & Diang’a, S. (2014). Construction project procurement: project planning challenges of Nigeria indigenous contractors. In Proceedings of the CIB W107 2014 international conference, Lagos, Nigeria held 28-30 January, 2014.

Mathonsi, M. D., & Thwala, W. D. (2012). Factors influencing the selection of procurement systems in the South African construction industry. African Journal of Business Management, 6(10), 3583-3594.

Mohammad, B. A, Adamu, T., & Ladi, B. D. (2015). Appraisal of project procurement policiesin Nigeria. American Journal of Engineering Research, 4(3), 19-24.

Musanzikwa, M. (2013). Public procurement system challenges in developing countries: The case of Zimbabwe. International Journal of Economics, Finance and Management Science, 1(2), 119-127.

Olanrewaju, S. B. O. (2015). Appraisal of material management strategies of construction firms in Ekiti state, Nigeria. Unpublished M. Tech Thesis. Bauchi, Nigeria: Department of Building Technology, Abubakar Tafawa Balewa University.

Oyeranti, G. A., Babatunde, M. A., & Ogunkola, E. O. (2011). An analysis of China-Nigeria investment relations. Journal of Chinese Economic and Foreign Trade Studies, 4(3), 183-199.

Rwelamila, P. D. (2010). Impact of procurement on stakeholder management. In E. Chinyio, & P. Olomolaiye (Eds.), Construction stakeholder management (pp. 195-215). West Sussex: Wiley Blackwell Publishing.

Safa, M., Shahi, A., Haas, C. T., & Hipel, K. W. (2014). Supplier selection process in an integrated construction materials management model. Automation in Construction, 48, 64-73.

Terakawa, A. (2011). Challenges facing public procurement and perspectives of land management, national institute for land and infrastructure management. Retrieved from https://www.nilim.go.jp/english/annual/ annual2011/2-1.pdf [Last accessed on 23 November 2023].

United Nations. (2015). Sustainable development goals. Retrieved from https://www.un.org/sustainabledevelop ment/sustainable-development-goals [Last accessed on 23 November 2023].

Published

01-03-2024

How to Cite

OJO, O. A., OLATILU, & ANA, A. (2024). EFFECTIVENESS OF PROCUREMENT OF CONSTRUCTION MATERIALS AMONG ROAD WORKERS IN EKITI STATE. Innovare Journal of Social Sciences, 12(2), 9–13. https://doi.org/10.22159/ijss.2024.v12i2.49843

Issue

Section

Original Article(s)